For security, risk and procurement leads who have been asked to run a third-party risk programme, or to fix one that lives in spreadsheets, and want one reference that covers the concept, the lifecycle and what the main European rules require.

Third-party risk management (TPRM) is the discipline of identifying, assessing, controlling and reviewing the risks that suppliers and other external parties create for your organisation. It covers the whole relationship, from inventory and due diligence to contract, periodic reassessment and exit, and NIS2, DORA and ISO/IEC 27001 all expect it.

What third-party risk management is

A third party is any organisation outside yours that provides a service, a product or access that your business depends on: a cloud provider, a payroll processor, a software vendor, a managed security service, a logistics partner, a consultancy with a login to your systems. Third-party risk management, usually shortened to TPRM, is the set of policies, roles and routines that identify those relationships, judge how much risk each one brings and keep that risk inside limits you have chosen.

The risk is not only cyber: a supplier can fail you through a breach, an outage, a vulnerable component or a financial collapse. This guide focuses on information security and operational resilience, where NIS2 and DORA put the weight.

Why it earns its own function: your security perimeter now includes other people's perimeters. NIS2 says so in its recitals, noting that attackers have often compromised an entity by exploiting vulnerabilities in third-party products and services. You cannot patch a supplier's systems, so what you control is the choice, the contract, the evidence you ask for and the plan for the day it goes wrong.

Source: Directive (EU) 2022/2555 (NIS2), Articles 20 and 21 and recital 85, on EUR-Lex (opens in a new tab)

TPRM, vendor management and supply-chain risk: how they differ

The three terms overlap and teams use them loosely, so it helps to fix them. Vendor management is the commercial and operational side: selecting, contracting, paying and getting performance from suppliers. Its questions are about price, service levels and delivery. TPRM sits on top of it and asks a different question: what can this relationship do to us, and is that acceptable? Vendor risk management and vendor risk assessment are, in practice, the same discipline with a narrower word, since a vendor is one kind of third party. Third parties also include partners, resellers, outsourced staff and affiliates that nobody calls a vendor.

Supply-chain risk management looks at the whole chain that delivers a product or service, including the suppliers of your suppliers and the components inside the software you buy. It is wider than TPRM in reach and usually narrower in depth: it studies flows and dependencies, while TPRM manages each direct relationship with a contract, an owner and evidence. NIS2 uses the phrase supply chain security, but the duty it creates is practical TPRM: assess each direct supplier, take its specific vulnerabilities into account and put security into the contract.

If your suppliers are contractors working on your premises, prequalification and coordination of activities is a related discipline with its own rules, explained in the Hodeitek post linked in the sources of this section.

Source: TPRM versus contractor management (CAE), on the Hodeitek blog (Spanish) (opens in a new tab)

Step 1: inventory your third parties and tier them by criticality

You cannot assess what you have not listed. Start from the sources that already exist: accounts payable, procurement, the identity provider, the list of SaaS applications and the contracts register. Each third party gets an internal owner, a service description, the data it touches, the systems it connects to and its contract dates. Expect the first list to be longer than anyone believed and to contain shadow IT that never went through procurement.

Then tier them. Tiering is what keeps the programme affordable, because it lets you spend deep review on a handful of suppliers and light review on the rest. Define three or four tiers and write down the rule, so two analysts reach the same tier for the same supplier.

Criteria that usually decide the tier

  • Dependency: does a critical process stop if this supplier stops, and how long can you operate without it?
  • Data: does it store or process personal, confidential or regulated data, and how much?
  • Access: does it have privileged access to your systems, networks or code?
  • Substitutability: how long would it take to move to another provider, and is there one?

Step 2: due diligence before onboarding

Due diligence is proportionate to the tier. A low-tier supplier may need a short self-declaration and a check of public information; a critical one needs evidence you can inspect. The aim is to decide whether to proceed, under which conditions, and what to monitor afterwards, not to collect documents for their own sake.

Regulation asks for the same sequence. DORA Article 28(4) lists what a financial entity must do before entering a contract, including assessing whether the service supports a critical or important function, identifying the risks including concentration, and undertaking due diligence on the prospective provider. The EBA outsourcing guidelines have a dedicated section on pre-outsourcing analysis, risk assessment and due diligence.

What a proportionate review looks at

  • Governance: who owns security at the supplier, which standards it follows and whether an independent party has certified or audited them.
  • Technical posture: what can be seen from outside, such as exposed services and known vulnerabilities, and how the supplier handles patches and incident response.
  • Data handling: where data is stored and processed, which subprocessors take part and how data is returned or deleted.
  • Resilience: business continuity and recovery plans, and how they have been tested.

Source: Regulation (EU) 2022/2554 (DORA), Articles 28 to 31, on EUR-Lex (opens in a new tab); EBA Guidelines on outsourcing arrangements (EBA/GL/2019/02), final report (opens in a new tab)

Step 3: contract clauses that make the risk manageable

The contract is the only moment where the balance of power is fully yours, so use it to turn the findings of due diligence into obligations. A risk you accepted in review but did not write into the contract is a risk you cannot enforce.

DORA Article 30 is the most detailed public list of what a security-relevant contract holds, and it is a good template even outside finance. For all ICT services it requires a clear description of the services and of any permitted subcontracting, the locations where data is processed, data protection provisions, return of data on insolvency or termination, service levels, assistance in incidents, cooperation with authorities and termination rights. For services that support critical or important functions it adds full service levels, notice and reporting duties, participation in resilience testing, unrestricted access, inspection and audit rights, and exit strategies with a mandatory transition period.

Clauses worth negotiating for any critical supplier

  • Security obligations tied to a named standard or control set, not to the word best efforts.
  • Notification of incidents within a stated time, with the information you need to meet your own deadlines.
  • Rules on subcontracting: prior notice, flow-down of the same obligations and a right to object.
  • Audit and information rights, or an agreed alternative such as an independent report.
  • Data location, return and deletion, including a format you can use.
  • Termination rights and a transition period long enough to move.

Source: Regulation (EU) 2022/2554 (DORA), Articles 28 to 31, on EUR-Lex (opens in a new tab)

Step 4: reassess on a schedule and after events

A supplier that passed review two years ago says little about today. Set a reassessment frequency per tier, for example yearly for critical suppliers and every two or three years for low-risk ones, and add triggers that bring a review forward: a reported breach, a new critical vulnerability in something the supplier runs, a change of ownership or subprocessor, a failed service level or a change in what you use the supplier for.

Combine sources, because each one measures something different. A questionnaire collects what the supplier declares about its controls. Documents and certificates show what an independent party checked at a point in time. An external scan shows what is visible from outside today. Vulnerability data tells you whether the components in use are exposed. None of them proves on its own that a control works, and you should say which one a given score rests on.

Decide in advance what happens when a review finds a problem: a remediation date agreed with the supplier, a compensating control, an escalation to the risk owner or, at the end of the line, the exit plan.

Step 5: offboarding and exit plans

Every relationship ends, by choice or not. The exit plan is written before you need it, at onboarding, and it answers four questions: how do we stop using the service, where does the data go, what replaces it and how long can we run without it. For critical services, test the plan, because a plan nobody has read is a guess.

DORA Article 28(8) makes this explicit for ICT services supporting critical or important functions: exit strategies that cover provider failure, quality deterioration and termination, plans that are documented, tested and reviewed periodically, and transition plans to move services and data to another provider or back in-house. The EBA outsourcing guidelines have a section on exit strategies for the same reason. At offboarding, revoke access, confirm deletion of data and keep the evidence.

Source: Regulation (EU) 2022/2554 (DORA), Articles 28 to 31, on EUR-Lex (opens in a new tab); EBA Guidelines on outsourcing arrangements (EBA/GL/2019/02), final report (opens in a new tab)

Fourth-party, nth-party and concentration risk

A fourth party is a supplier of your supplier, and nth party is the general name for any depth beyond your direct relationships. Incidents can reach an organisation through that layer: a cloud platform, a software library or a managed service that many suppliers use in common. You rarely have a contract with these parties, so the lever is the contract with your direct supplier, which should oblige it to disclose, flow down and notify about its own subcontractors.

Concentration risk is the sum of those hidden overlaps. It appears when many of your critical services rely on the same provider, directly or through others, or when a provider is hard to replace. DORA Article 29 asks financial entities to assess whether a new arrangement would leave them with a provider that is not easily substitutable, or with several arrangements with the same or closely connected providers, and to weigh long or complex subcontracting chains. NIS2 recital 85 says entities could consider risks from other levels of suppliers, and the EBA guidelines add rules for sub-outsourcing of critical functions.

To manage it you need a map, not a list. The register of information that DORA requires, in the format of Implementing Regulation (EU) 2024/2956, assigns each provider a rank in the chain: direct providers are rank 1 and subcontractors a higher number. Outside finance nothing forces that format, but recording who depends on whom is the only way to see that five apparently independent suppliers all run on the same platform.

Source: Regulation (EU) 2022/2554 (DORA), Articles 28 to 31, on EUR-Lex (opens in a new tab); Implementing Regulation (EU) 2024/2956, register of information templates, on EUR-Lex (opens in a new tab); Directive (EU) 2022/2555 (NIS2), Articles 20 and 21 and recital 85, on EUR-Lex (opens in a new tab)

Roles and responsibilities in a TPRM programme

Programmes fail more often from unclear ownership than from missing tools. The principle that regulators repeat is that responsibility cannot be outsourced: DORA Article 28(1) says the financial entity remains fully responsible for its obligations, the EBA guidelines say outsourcing does not delegate the management body's responsibilities, and NIS2 Article 20 makes management bodies approve, oversee and answer for risk-management measures.

Beneath that, split the work so that each decision has a named owner and a second pair of eyes. The exact titles differ by company; the functions do not.

Who does what

  • Board and management body: approve the TPRM policy and risk appetite, receive reporting and receive training on the subject, as NIS2 Article 20(2) expects.
  • CISO or security function: defines the assessment method, reviews technical evidence and advises on residual risk.
  • TPRM or vendor risk manager: runs the programme, keeps the inventory and the calendar, and chases findings to closure.
  • Business or relationship owner: knows what the supplier does for the business, requests onboarding, and is accountable for the relationship and its exit plan.
  • Procurement and legal: enforce the process at contracting, negotiate the clauses and keep contract data current.
  • Compliance, risk and internal audit: map requirements, challenge the programme and test that it works as written.

Source: Directive (EU) 2022/2555 (NIS2), Articles 20 and 21 and recital 85, on EUR-Lex (opens in a new tab); Regulation (EU) 2022/2554 (DORA), Articles 28 to 31, on EUR-Lex (opens in a new tab); EBA Guidelines on outsourcing arrangements (EBA/GL/2019/02), final report (opens in a new tab)

NIS2: supply chain security as a minimum measure

Directive (EU) 2022/2555 lists the minimum cybersecurity risk-management measures for essential and important entities in Article 21(2). Point (d) is supply chain security, including security-related aspects of the relationships between each entity and its direct suppliers or service providers. Member States had to apply their transposition measures from 18 October 2024.

Article 21(3) tells entities what to weigh: the vulnerabilities specific to each direct supplier, the overall quality of their products and cybersecurity practices including secure development procedures, and the results of coordinated risk assessments of critical supply chains carried out under Article 22(1).

Two points follow. NIS2 is framed around direct suppliers, so fourth parties are a consideration rather than a duty. And Article 20 puts approval and oversight of these measures on the management body, which can be held liable, so TPRM reporting belongs in front of the board.

Source: Directive (EU) 2022/2555 (NIS2), Articles 20 and 21 and recital 85, on EUR-Lex (opens in a new tab)

DORA: the strictest regime for ICT third parties

Regulation (EU) 2022/2554 applies to financial entities from 17 January 2025 and treats ICT third-party risk as an integral part of ICT risk management. Article 28 sets the principles: full responsibility stays with the entity, proportionality, a strategy on ICT third-party risk reviewed regularly (not for microenterprises), pre-contract assessment, risk-based audit frequency, termination rights and exit strategies.

Article 28(3) requires a register of information on all contractual arrangements for ICT services, kept at entity, sub-consolidated and consolidated level, distinguishing arrangements that support critical or important functions, and available to the supervisor on request. The standard templates are laid down by Implementing Regulation (EU) 2024/2956 of 29 November 2024, which identifies providers by LEI or EUID.

Article 29 covers concentration and subcontracting, Article 30 the key contractual provisions, and Article 31 the designation by the European Supervisory Authorities of critical ICT third-party service providers, which then fall under EU-level oversight.

Source: Regulation (EU) 2022/2554 (DORA), Articles 28 to 31, on EUR-Lex (opens in a new tab); Implementing Regulation (EU) 2024/2956, register of information templates, on EUR-Lex (opens in a new tab)

EBA guidelines on outsourcing, and what is changing

The EBA Guidelines on outsourcing arrangements (EBA/GL/2019/02) apply from 30 September 2019 to credit institutions and payment institutions. They are the long-standing European reference for the lifecycle in this guide: governance and the principle that the management body keeps responsibility (paragraph 35), pre-outsourcing analysis, risk assessment and due diligence, contractual requirements, sub-outsourcing of critical or important functions, access and audit rights, oversight, and exit strategies, plus a register of all outsourcing arrangements.

The EBA now lists final Guidelines on third-party risk management for non-ICT services, awaiting translation and not yet applicable, which once applicable will repeal the outsourcing guidelines. Check which text binds you.

Source: EBA Guidelines on outsourcing arrangements (EBA/GL/2019/02), final report (opens in a new tab); EBA Guidelines on third-party risk management (non-ICT services), status page (opens in a new tab)

ISO/IEC 27001 and Spain's ENS

ISO/IEC 27001:2022 covers suppliers in five controls of Annex A: 5.19, information security in supplier relationships; 5.20, addressing information security within supplier agreements; 5.21, managing information security in the ICT supply chain; 5.22, monitoring, review and change management of supplier services; and 5.23, information security for use of cloud services. The text of the standard is paywalled, so read it from ISO or your national body. Note that a supplier's certificate shows that it runs a management system within a scope, not that a given control works for your service.

In Spain, Royal Decree 311/2022 regulates the Esquema Nacional de Seguridad. Its Annex II groups external resources under measure op.ext, with four controls: op.ext.1 contracting and service level agreements, op.ext.2 day-to-day management, op.ext.3 protection of the supply chain and op.ext.4 interconnection of systems. The annex states that the organisation keeps full responsibility for the risks of the information and services it entrusts to external resources.

Applicability depends on the system category: op.ext.1, op.ext.2 and op.ext.4 apply from Medium, and op.ext.3 applies at High, where it asks for an impact analysis of supply-chain incidents, a risk estimate and containment measures.

Source: ISO/IEC 27001:2022, information security management systems, on iso.org (opens in a new tab); Royal Decree 311/2022 (ENS), Annex II, measures op.ext, in the BOE (Spanish) (opens in a new tab)

Metrics to track

Choose a handful of indicators that answer the question the board actually asks, which is whether the programme is reducing exposure. Report them by tier so that a good average does not hide a critical supplier in trouble.

Indicators worth reporting

  • Coverage: share of third parties inventoried with an owner and a tier, and share of critical suppliers with a completed assessment.
  • Timeliness: share of reassessments done within their scheduled window, and average age of the last review per tier.
  • Findings: open findings by severity, average time to close and number past their agreed date.
  • Concentration: number of critical services that depend on the same provider, directly or through another.
  • Exit readiness: share of critical suppliers with a documented exit plan, and how many have been tested.
  • Contract coverage: share of critical contracts that contain your security clauses, incident notification and audit rights.

Common mistakes

Most weak programmes fail in the same few ways. Check yours against this list before you add more process.

  • Treating the questionnaire as the assessment. A long form answered once, with no evidence behind it, is a declaration, not a verification.
  • Giving every supplier the same review, which exhausts the team on low-risk vendors and leaves critical ones under-examined.
  • Doing due diligence at onboarding and never again, so the file describes a supplier that no longer exists.
  • Having no single inventory, so procurement, IT and security each hold a different list.
  • Ignoring fourth parties and concentration until an outage shows that many suppliers share one platform.
  • Collecting findings without owners, dates or escalation, so nothing closes.
  • Writing an exit plan once and never testing it, or having none for the supplier you cannot replace.

Where to start: a first-quarter checklist

You do not need a platform on day one. You need an inventory, a tiering rule and a calendar, and then tooling that removes the manual work once the method is stable.

A realistic order of work

  • Name an accountable executive and a programme owner, and write a one-page policy that the management body approves.
  • Build one inventory from procurement, finance, identity and SaaS discovery, with an internal owner for every entry.
  • Define three or four tiers with written criteria, and tier every supplier.
  • Choose the evidence you ask for per tier, and prepare a standard questionnaire and a contract annex with the clauses above.
  • Review the critical tier first, starting with the suppliers that have no alternative or touch your most sensitive data.
  • Record dependencies between your critical suppliers to find shared platforms.
  • Set the reassessment calendar and the events that trigger an early review.
  • Write and test an exit plan for the most critical supplier, then report the first set of metrics to the board.

Where HodeiShield fits, and where it does not

HodeiShield is an integrated platform for part of this lifecycle, and it is one option among several. According to its documentation, it calculates a supplier score from 0 to 100, draws the dependencies you declare in a graph with blast radius and an HHI concentration index, runs an external scan and matches supplier SBOMs against OSV.dev, and offers a portal where the supplier answers questionnaires through a personal link, with no account; the supplier can save answers as it goes, and once it submits, the response is closed. It also estimates FAIR exposure in euros with a simulated uncertainty band that is not calibrated, because it uses sector parameters and not your own loss data; the correlation factors it applies between suppliers that share a provider are likewise uncalibrated estimates.

Its limits: scans are scheduled re-scans from external sources, not a live view; dependencies are the ones you declare; and documentary evidence is uploaded or linked. It supports your programme, but it does not make you compliant, and the decisions stay with your people. To compare tools by sector, read the guide on evaluating TPRM platforms.

Related on HodeiShield: HodeiShield, third-party risk management

Frequently asked questions

What does TPRM stand for?
TPRM stands for third-party risk management. It is the programme that inventories suppliers and other external parties, tiers them by criticality, assesses them before onboarding, writes controls into contracts, reassesses them over time and plans their exit.
Is vendor risk management the same as TPRM?
Mostly. A vendor is one kind of third party, so vendor risk management is a narrower label for the same discipline. TPRM also covers partners, resellers, outsourced staff and affiliates, and it is the term used in regulation and standards.
What is the difference between a vendor risk assessment and TPRM?
A vendor risk assessment is one step: judging the risk of a given supplier at a point in time. TPRM is the whole programme around it, including the inventory, tiering, contracts, scheduled reassessment, remediation, offboarding and reporting.
What is fourth-party risk?
It is the risk that comes from the suppliers of your suppliers. You usually have no contract with them, so you manage it through your direct supplier: require disclosure of subcontractors, flow-down of security obligations and notice of changes, and map shared dependencies.
Who is responsible for third-party risk?
Ultimately the management body, which cannot delegate its responsibility, as NIS2 Article 20 and DORA Article 28 make clear. Day to day, a TPRM owner runs the programme, business owners own each relationship, and security, procurement, legal and compliance each carry a defined part.
Does NIS2 require third-party risk management?
It requires supply chain security as a minimum measure under Article 21(2)(d), with attention to each direct supplier's vulnerabilities and practices under Article 21(3). It does not prescribe a method, so the programme in this guide is a way to meet it, not a certificate of it.
How often should I reassess a supplier?
No rule fixes one interval for all. Many programmes review critical suppliers yearly and low-risk ones every two or three years, and bring a review forward after a breach, a new critical vulnerability, a change of ownership or subprocessor, or a failed service level.

How do I evaluate TPRM platforms for my sector?If you are ready to choose software, read how to evaluate TPRM platforms for your sector under DORA, NIS2, ENS and other regimes.

Sources

  1. Directive (EU) 2022/2555 (NIS2), Articles 20 and 21 and recital 85, on EUR-Lex (opens in a new tab)
  2. Regulation (EU) 2022/2554 (DORA), Articles 28 to 31, on EUR-Lex (opens in a new tab)
  3. Implementing Regulation (EU) 2024/2956, register of information templates, on EUR-Lex (opens in a new tab)
  4. EBA Guidelines on outsourcing arrangements (EBA/GL/2019/02), final report (opens in a new tab)
  5. EBA Guidelines on third-party risk management (non-ICT services), status page (opens in a new tab)
  6. ISO/IEC 27001:2022, information security management systems, on iso.org (opens in a new tab)
  7. Royal Decree 311/2022 (ENS), Annex II, measures op.ext, in the BOE (Spanish) (opens in a new tab)
  8. TPRM versus contractor management (CAE), on the Hodeitek blog (Spanish) (opens in a new tab)

See the lifecycle on your own suppliers

Pick a plan and try HodeiShield for 15 days.

Start your trial